Construction and Temporary Disruptions
To assist you with your visit, please view and note any construction or temporary disruptions that are currently taking place throughout our various hospital sites.
Zone C Cheapside Lobby Terrazzo Floor Repair
Start Date:
2026-10-19
End Date:
2026-11-30
Time:
17:00:00 - 08:00:00
Reason for disruption:
The terrazzo floor in the lobby was damaged and repairs are to be completed through an insurance claim. Areas requiring a full replacement will be fully hoarded off in 3 phases while the remainder of the floor gets an overall buff, polish and seal. No clinics or elevators will be blocked. Staff and patients will need to take alternate paths of travel to get to their destination. Additional signage will be posted throughout to assist.
Alternate Facilities/Services:
Additional signage will be posted throughout to assist.
Traffic Advisory: Waterman Road Construction and Temporary Access Changes at Parkwood Institute
Start Date:
2026-10-26
End Date:
2026-11-13
Time:
07:00:00 - 19:00:00
Reason for disruption:
As part of the Wellington Gateway Project, construction work will take place on Waterman Road at Wellington Road from October 26 through November 13. The work includes water connections, curbing, grading, and paving, and will result in changing traffic patterns throughout the construction period. At various times, there may be full road closures, intermittent closures, or restrictions affecting either the campus entrance or exit. Please plan for additional travel time when coming to or leaving the Parkwood campus and follow all posted traffic control signage for your safety.
Alternate Facilities/Services:
Please note that Western Counties Road at Commissioners Road and Valour Road at Commissioners Road will remain open and may serve as alternate access routes during the construction period.
Zone C Lobby Elevator Upgrades
Start Date:
2026-11-09
End Date:
2026-12-11
Time:
07:00:00 - 17:00:00
Reason for disruption:
Elevator Upgrades at SJH, Zone C Lobby
Alternate Facilities/Services:
To minimize disruption, the elevators will be upgraded one at a time. Patient elevator (E25) will be out of service for approximately 4-5 weeks starting November 9th. During this time, patient elevator (E24) will remain operational for staff, patients, and visitors. Signage will be posted once work begins. Any questions, please contact Angela Torres, project consultant at angela.torres@sjhc.london.on.ca